Docs

Dates: BS and AD

Typing dates quickly in Bikram Sambat or AD, and how the fiscal year works.

Which calendar

Each company has a Default company date (AD / BS), chosen when you create it (BS by default for Nepal). Reports and ledgers show the Miti (BS) and the AD date side by side.

F2 changes the working date: the box has an AD Date row and a BS Date row; type in either and the other fills in. In a voucher, F2 moves to the date, which you type in BS.

Typing dates quickly

You type You get
5 The 5th of the current month
1-4 The 1st of month 4 (Shrawan), in the current fiscal year
1-4-2083 or 2083-04-01 A full date
2 Kar Month by name: Bai, Jes, Ash, Shr, Bha, Asw, Kar, Man, Pou, Mag, Fal, Cha
+ / - One day forward / back (press again for more)
T Today
M / H First / last day of the month
Y / R First / last day of the year

Separators can be -, /, . or a space. As you type, SAHARA Core shows the BS date, the AD date and the weekday. Impossible days are refused. A date outside the open period is accepted with a warning.

The fiscal year

Nepal’s fiscal year runs from 1 Shrawan to the last day of Ashadh, and a partial date is placed in the working fiscal year. In Shrawan, typing 5-3 (5 Ashadh) means the Ashadh at the end of that fiscal year.

Convert any date with the free Nepali date converter.